- ACAD and BCAD: Create Bulk Lots and the shared Bulk Easement workflow can trace enclosed areas from selected intersecting lines and open polylines. Boundaries no longer have to be drawn as separate, already-closed lot outlines.
- ACAD and BCAD: Bulk boundary preparation supports lines, horizontal arcs and circles, lightweight polylines and simple legacy 2D/3D polylines. Red previews show available areas and green previews show numbered areas; only assigned areas are created.
- ACAD and BCAD bulk areas: Crossings and T junctions are split into usable boundaries. Duplicate and overlapping edges and dangling extensions are resolved so valid enclosed lots can be found in ordinary survey linework.
- ACAD and BCAD bulk areas: Small open-end gaps below 0.001 drawing units can be bridged without moving original vertices. This is a 1mm tolerance in the metre based ADAC workflow; larger openings remain open.
- ACAD and BCAD bulk areas: Curved boundaries retain their arc bulges for selection, preview and saved geometry. Area calculations include the circular contribution, and straight 3D boundaries retain their vertex elevations.
- ACAD and BCAD bulk areas: Original selected linework is retained. Temporary boundary objects are removed after completion, cancellation or an error. Unsupported geometry, interior-island regions and curved boundaries at incompatible elevations are reported instead of being silently flattened or filled incorrectly.
- MCAD Asset Convert: Native project header information now fills missing infrADAC project fields, including fields hidden by the selected receiver profile. Existing populated infrADAC project edits and the selected export target are retained.
- MCAD Asset Convert: Project information is committed only after native asset writes have been verified. The converter checks for a matching native bridge and rejects stale job or registry information before applying incompatible changes.
- MCAD Asset Convert: Repeat-conversion tracking now stores only the editable field baseline rather than embedding another complete source snapshot. Original ordered native properties remain retained once, including inactive choices, while independent infrADAC edits and conflict detection remain supported.
- Floating and Network licensing: Workstation installation no longer consumes a runtime seat or incorrectly applies the Computer licence activation count to a concurrent licence. The number of installed workstations may exceed the concurrent seat count.
- Floating licensing: Authorised update discovery and downloads work before checkout, while the pool is full and after a seat has been returned. Update checks do not acquire, renew or return a runtime seat, and an explicitly returned local checkout stays returned.
- Network licensing: Plugin update discovery uses the actual installed Network configuration. MCAD can obtain packages from the customer's authenticated Network cache, with download-ticket validation and package hash verification.
infrADAC v1.5.6.22 - Asset conversion, bulk areas and licensing reliability
infrADAC BCAD / Licensing / v1.5.6.22
infrADAC BCAD
infrADAC 1.5.6.22 brings together desktop corrections for asset creation, native ADAC conversion, bulk land boundaries and Floating and Network licensing. This cumulative release is intended for customers updating from ACAD, BCAD, DCAD and MCAD. Platform specific changes are identified below. ACAD and BCAD can derive bulk lots and easements from intersecting open linework. Two-point pipe and sewer connection creation has been corrected without requiring artificial intermediate points. MCAD Asset Convert now carries native project information into infrADAC, handles empty optional attributes correctly, identifies records linked to deleted geometry and reduces unnecessary job storage during conversion while retaining the native ADAC information. Floating and Network installations and update checks are separated from runtime seat use. Additional workstations can be installed while the pool is occupied, and authorised updates do not require a checked-out seat. Runtime use remains subject to the purchased concurrent seat allowance. Related server changes require the updated central licensing service and, for Network customers, the updated customer Network Licence Server.
Text backup